1)time of delivery:
Finish production within 30-45 days after opening Irrevocable L/C at sight
After the first container, the shipping time will be scheduled per container as
2) L/C shall be paid against acceptance of quality standard sheet.
1)be scheduled per container as 意思我不懂
2可告訴我他的意思嗎? L/C 的承對方式 以品質單字 承對?
品質不好就拿不到錢嗎?
不好意思…我是個新手…所以有的地方不懂
感謝大大地幫忙…教導我︿︿
--