我剛買了預售屋(而且在下目前還在外州,快蓋好才會搬家),且遞送自己的 floor plan
野人獻曝把這陣子和 builder, agent 討論的 specifications/options 心得 post 出來
List of Specification
1) 2 Side Lights by the front door
2) Full Front Porch with 2 porch lights
3) 2 Driveway lights on each side of Garage Door, 1 Service Door in Garage, and 2 lamp Post lights by walkway to house from driveway
4) Electric Garage Door Operator capacitates a double car width Garage Door. w/ 2 Remotes
5) Furnished Garage
6) Mail Box
7) 2 Garden spickets: 1 in front and 1 in back of house
8) Two Attic louver vents: One on each side of roof
9) 9’ Poured Concrete foundation wall in basement
10) Walk-out and up Areaway w/ 2’ overhang in basement, 1 daylight window, and 1Egress window
11) Radon Piping/Rough-In, Sump Pump Piping/Rough-In and Future Bathroom
12) Plumbing Rough-Ins in basement
13) 1 GFCI outlet over all vanities/Sinks
14) 9’ Ceiling all of 1st Floor living area
15) Expand 1’ (interior room measurement) to left side of house
16) Marble Fireplace surround
17) Electrical Housing in ceiling with dedicated switch in all Bedrooms for future Ceiling Fan/Light
18) 48” wide x 36” deep island (w/ raised breakfast bar) in Kitchen per floor plan
19) Vent out duct for Range exhaust hood
20) 4 Recessed lighting in Kitchen
21) 3/4 hp Garbage Disposal with dedicated switch
22) Water line for Refrigerator with local shut-off
23) Gas: Heat, Water heater, Cooking Range & Oven, Fireplace, and Clothes Dryer
24) Water-Jet message Jacuzzi in Master Bath with separate shower
25) All vanity base cabinet: 36” high
List of additional Options with charges
26) Deadbolt for Front and Basement Door
27) 10' x 10' Concrete Patio
28) Move coat closet in foyer area to hallway entering from garage (Fire Proof drywall)
29) Carpeting in stairway and landing down to basement
30) Additional 12" base and wall cabinet in kitchen to left of sink
31) Railing w/ decorative spindles in all staircase main floor along hallway entering from garage, stairway and all 2nd story hallways along staircase, and where it is open to foyer on second floor
32) 10 Year Structural Warranty
33) Laundry tub Install: plumbing and drain complete hook-up
34) Open staircase from main floor to basement with door placed at basement level: finishing drywall, base molding and paint area around stairway
我有 Word 檔,如果這個版面看得很吃力,麻煩站內信給在下。
--
野人獻曝把這陣子和 builder, agent 討論的 specifications/options 心得 post 出來
List of Specification
1) 2 Side Lights by the front door
2) Full Front Porch with 2 porch lights
3) 2 Driveway lights on each side of Garage Door, 1 Service Door in Garage, and 2 lamp Post lights by walkway to house from driveway
4) Electric Garage Door Operator capacitates a double car width Garage Door. w/ 2 Remotes
5) Furnished Garage
6) Mail Box
7) 2 Garden spickets: 1 in front and 1 in back of house
8) Two Attic louver vents: One on each side of roof
9) 9’ Poured Concrete foundation wall in basement
10) Walk-out and up Areaway w/ 2’ overhang in basement, 1 daylight window, and 1Egress window
11) Radon Piping/Rough-In, Sump Pump Piping/Rough-In and Future Bathroom
12) Plumbing Rough-Ins in basement
13) 1 GFCI outlet over all vanities/Sinks
14) 9’ Ceiling all of 1st Floor living area
15) Expand 1’ (interior room measurement) to left side of house
16) Marble Fireplace surround
17) Electrical Housing in ceiling with dedicated switch in all Bedrooms for future Ceiling Fan/Light
18) 48” wide x 36” deep island (w/ raised breakfast bar) in Kitchen per floor plan
19) Vent out duct for Range exhaust hood
20) 4 Recessed lighting in Kitchen
21) 3/4 hp Garbage Disposal with dedicated switch
22) Water line for Refrigerator with local shut-off
23) Gas: Heat, Water heater, Cooking Range & Oven, Fireplace, and Clothes Dryer
24) Water-Jet message Jacuzzi in Master Bath with separate shower
25) All vanity base cabinet: 36” high
List of additional Options with charges
26) Deadbolt for Front and Basement Door
27) 10' x 10' Concrete Patio
28) Move coat closet in foyer area to hallway entering from garage (Fire Proof drywall)
29) Carpeting in stairway and landing down to basement
30) Additional 12" base and wall cabinet in kitchen to left of sink
31) Railing w/ decorative spindles in all staircase main floor along hallway entering from garage, stairway and all 2nd story hallways along staircase, and where it is open to foyer on second floor
32) 10 Year Structural Warranty
33) Laundry tub Install: plumbing and drain complete hook-up
34) Open staircase from main floor to basement with door placed at basement level: finishing drywall, base molding and paint area around stairway
我有 Word 檔,如果這個版面看得很吃力,麻煩站內信給在下。
--
Tags:
海外工作
All Comments
By Tracy
at 2009-06-30T12:56
at 2009-06-30T12:56
Related Posts
今年 H1B 審核速度比較慢嗎?
By Tristan Cohan
at 2009-06-26T00:52
at 2009-06-26T00:52
有買過預售屋的經驗嗎?
By Poppy
at 2009-06-25T08:59
at 2009-06-25T08:59
有買過預售屋的經驗嗎?
By Skylar DavisLinda
at 2009-06-25T01:34
at 2009-06-25T01:34
有買過預售屋的經驗嗎?
By Genevieve
at 2009-06-25T00:56
at 2009-06-25T00:56
有人H1-B還在pending的嗎
By William
at 2009-06-25T00:52
at 2009-06-25T00:52